ERP Go-Live Checklist: 30 Things to Verify Before Launch
ย A new ERP system will cost businesses more if they do not follow a Go-live checklist. Businessesโฆ
Many reasons contribute to the failure of the D365 implementation, which are neglected and underestimated during the project.
Inadequate planning, poor migration, underestimating financial complexity, wealth, lack of user adoption, and over-customization.
Plan strategically by keeping your goal in mind, validating data, performing full reconciliation, setting timelines, training the users, testing all workflows, and avoiding unnecessary customization to mitigate these issues.
ย
Imagine spending time on Dynamics 365 Business Central implementation to introduce automation and AI, only to fail. All the hard work you do goes in vain as you missed the important thing.
According to Gartnerโs research, almost 70% of ERP implementations fail because they do not align with business strategy.
Failures usually arise from poor planning, undefined growth, and a lack of planning. This failure may cause you significant harm, as it does not align with your business objectives. They stem from expectations that donโt align with reality and executions that donโt meet business standards.
Dynamics 365 implementation refers to deploying the Dynamics solution for a business to optimize its business processes. Businesses use the Dynamics solution to automate their finance, HR, inventory, supply chain, and other core processes and look for Dynamics implementation.
Being a big name in the industry, Microsoft is trusted worldwide. Its implementation has to be strategically planned in order to avoid failure. A successful implementation comes from careful installation, proper data migration, customization, integration, and end-user training.
Like every other planning you do in life, you expect positives at the other end, and the same is also the case with D365 implementation. Everything seems good, and you donโt think about the drawbacks or what another situation would be.
You implement the system and feel all the problems would vanish away. But you are in deep shock as reality hits you. And it hits harder than you have ever imagined.
The drift shows up as soon as you proceed toward adopting the system. You keep on neglecting it as you expect it to go away with time.
For instance, if a field is missing, you think it would be fixed later as it has been missed temporarily.
So, if you see the data has issues, you assume it will be cleaned later, and you also adjust the process that doesnโt fit as a temporary solution.
But all these issues contribute to the crashing of the system.
There comes a conflict between the system design and its actual use.
As you move forward, all these temporary fixes and compromises are adopted and become your daily routine. Such inconsistencies in data, incomplete setups, and manual tracking prevent the system from delivering valuable outputs.
The reality of a successful project is efficiency and reliability. And the picture depicted is of implementation and processing.
So, this system does not serve the business but becomes a bottleneck in the way of success.
We will discuss what goes wrong in detail, but the major crux is that businesses usually want to implement the system at 3x speed without prioritizing alignment. Rushing the go-live leads to accepting shortcuts, missing alignment of the teams, and making poor decisions.
The findings of the scenario say that the system is perfectly fine, but the problem lies with the implementation. There is a problem with the alignment of the system and the business operations.
This is why the implementation fails, and you have just implemented a system that seems perfect but doesnโt perform according to your expectations. Even if you acquire any of the top 20 ERP systems without proper planning, your implementation may fail.
You always have a way to correct everything by analyzing the mistakes and going in the right direction. That is why you need to identify the root cause and work on it.
They prepare a structured recovery plan by understanding the existing issues.
Review the current system, identify what is working and what is critical, and create problems. Have a look at the processes that are still relying on manual processes.
After discovering all the issues, you must prioritize only the critical ones. Only the ones that are troubling the most need to be addressed. The problems related to customers, finances, compliance, and inventory must be solved on a first-come, first-served basis.
Then comes reviewing all the integrations, customizations, and data quality. Messy data is harmful to the solution, as is unnecessary customization.
The improvement plan must have clear goals that need to be achieved. These can include increasing user adoption, faster order processing, and improving inventory accuracy.
One of the most significant reasons is a lack of planning and preparation. This leads to a failed implementation as you treat the Business Central implementation like any other project.
This is not another project that the IT team needs to manage. You need proper planning to execute the system. Stakeholders should come together and decide what to get and what to neglect.
At the end, it just became a technical implementation serving no benefit to the business.
Keep the measurable goal in view if you really want the system to perform while keeping IT just an enabler of the process.
Find out How I Turned a Failing ERP Project Around with a New Dynamics 365 Strategy.
Data migration is never taken seriously and is treated like a task that can be skipped at the moment with a โsee you laterโ attitude. This leads to migrating messy data that disrupts the new system.
When this uncleaned data entered the new system, it led to chaos with broken reporting and loss of user interest. The unreliability of the data becomes the root cause.
All this happens again due to no proper planning of the step.
This is why you should get D365 migration services in the initial months and limit its scope. Donโt migrate all your data immediately without proper screening.
At this stage, the data that is useful should be migrated, while historical data should be stored outside the system.
Then data validation also plays a key role in filtering out the correct data. Validate data by running multiple cycles.
Migrating open orders is the key to failure. It becomes a silent killer of the system.
All the open transactions are interconnected, and even a small mistake can disrupt the full system. This is why it is a delicate part of the system.
This issue can be mitigated by performing full reconciliation and building detailed transformation logic.
User adoption is a must-have field that cannot be neglected. The whole system is for the users to use, and if they are not accepting it, then itโs a complete failure.
Users must be prepared in advance to adopt this change. Start introducing the system to them in the early stages so they will adopt it, as there is a lot of user resistance in the beginning.
Even if your ERP implementation is successful, the resistance of the users will make it a complete failure.
The other common reason why users donโt adopt it is incomplete data and underutilization. The manual processes are still in use, which leads to failure in adoption.
The solution is to offer role-based training to the users so they donโt have a lot of burden while learning to use it. Without proper training, users get a chance to get away with learning to use a new system. They always have excuses to shy away.
Lack of training becomes a reason for failure as it is often overlooked initially. It is not taken seriously, and no one ever thinks about its implications later.
Additionally, use clean data to train the users for correct and proper usage of the system.
And answer all the whys instantly to remove the confusion.
A frequent problem seen while training the users is overwhelming them with a lot of new things during the training. Keep things simple in the beginning to avoid confusion.
You are happy to see the progress of the project, but the last few months have become overwhelming. All the essential steps like testing, migration, and training are a part of the last cycle.
Then it becomes too much to manage, and the incomplete validation becomes the reason for major problems. The system goes live but with a lot of risk of failure.
The important step that you miss in the beginning is paying attention to critical workstreams early.
Donโt just migrate data and perform tasks and then check them after going live. Test them with multiple iterations to avoid issues later. This will save your system from crashing after go-live.
You assume the testing is done, but the reality often isnโt. All of the testing takes place when everything goes fine, but you donโt focus on what is done.
When you perform the function, you see the output and sit back and relax. The question is: is the output correct?
Did you run it multiple times to see if it follows the pattern or breaks in the middle?
You are happy because you are testing the system with dummy data initially. What if real data is loaded into the system?
You did not test the edge cases and are not bothered about the data accuracy when it comes to finances. This results in neglecting abundant errors in the system.
The business will not see anything until itโs time for month-end closing.
Customization is used to make the system fit for the business. But it can lead to complete failure of a business through over-customization. Over-customization is doing more than needed.
Sometimes businesses donโt explore the full system and forget that there are features that already exist and can be used by the business. Without properly exploring the system, they go for customization that creates chaos later.
This over-customization makes it very difficult to keep the system intact in the long term. Additionally, businesses also face difficulties in upgrading the system. The upgrades also become more expensive.
The only way to avoid this issue is to use the standard features in the system and customize only when the features are not available in the system or do not match your needs. Changes must only made in exceptional cases, and that too with the help of an experienced partner who understands the system well.
Discover how we rescued a failed Business Central implementation to get insights into the fixing process.
There are certain best practices that businesses need to follow to make each implementation successful. An implementation is not just a random project but a significant one that has to be planned. To get the most out of it, you should:
Also Read: ERP Go-Live Checklist: 30 Things to Verify Before Launch
The system going live is not the real success that you have waited for. It is just the start of your project, and you have a long way to go, as the real goal is to offer real business value.
There must be measurable KPIs that you need to assess the system. It includes eliminating manual work, improving data accuracy, closing the books on time, and increasing user adoption.
If you have implemented the system and want to ensure user adoption, then you must see that the employees have abandoned the old way they used to work. For example, they should not be using spreadsheets for data management.
If you fail to improve the financial process, then see what change the system brought. Compare the month-end closing before and after implementation.
Also, interact with the employees who are using the system and gather their replies. Ask them what has changed and what issues they are facing while using the system. Offer guidance on what can be resolved and improve what needs to be improved.
Then you must not forget that a partner can truly make a difference. An experienced Dynamics 365 partner offers a whole new experience as they are aware of all the dos and donโts of the system. They work to make the system reliable and efficient.
For example, they will not overly customize the system, which leads to issues later. They will spend time understanding your business process and not rush into the Dynamics 365 Business Central Development.
Not only that, they are always there after going live to support the business in times of need when it is needed the most. They will offer adequate support to mitigate the issues. They will work continuously to make the system more efficient.
The reasons identified for failure help you plan your implementation strategically to avoid any issues. Every business needs to learn from its mistakes, and in the case of D365 implementations, plan strategically, migrate clean data, and use standard features for workflows to avoid overcustomization. Take change management seriously by training users before the complete rollout. Also, collaborating with a D365 partner will help you in the long term.
Dynamics 365 implementation fails due to some very common mistakes that include poor migration strategy, over-customization, inadequate planning, lack of training, and weak testing.
To avoid these mistakes, businesses should plan the implementation, keep customization minimal, use standard features, and migrate clean data only. Also, provide some training to the users and test in iterations to ensure the system works well.
The users who resist adopting the system make the whole idea of implementation a failure. The system has to be used by the users so that it can deliver value.
Yes, a successful and trusted partner knows the dos and donโts of the industry. They apply best practices, continuously optimize the system, and refine it to make it work for your business. They follow a structured approach to implement the system.
Over-customization makes it difficult to manage the system as it increases development costs, creates technical dependencies, and complicates future changes. This is why evaluating functionalities is significant before customization.

Trango Tech, a certified Microsoft Solutions Partner, transforms businesses by offering tailored ERP solutions that deliver a high return on investment (ROI).
Read MoreCalculate your complete Business Central implementation cost using our cost calculator.
Calculate now!Your Email Address Will not be published. Required Fields Are Marked
If you are confused and need expert advice to transform your business, our experts are available 24/7.
Don't waste a single second, as you will be left behind while others are already ahead, moving fast. Start Now!